- What is my building's evacuation plan?
- What is the severe weather plan for Churchill-Haines?
Answer
Automated External Defibrillator (AED) Location
- First Floor – North - Outside Rm 190
Evacuation Plan
In the event that Churchill-Haines Laboratories Biology Department must be evacuated, the following procedures shall be followed.
- Upon activation of the fire alarm, all persons within Churchill-Haines will immediately begin exiting the building through the nearest available exit route.
- Prior to leaving the room, any open fires, hot plates, coffee pots, or similar equipment should be turned off.
- Electrical equipment that cannot be left unattended for prolonged periods, such as laboratory equipment, should also be turned off prior to exiting the room.
- Designated staff from each area will quickly survey their area to assure that evacuation is in progress or completed. The following staff have been designated:
- East-West Corridor – Senior Secretary
- South and Central Service Corridor – Laboratory Storekeeper
- All persons within Churchill-Haines will convene on the lawn west of the Muenster University Center. This will allow quick assessment for any missing persons and avoid interference with the emergency responders.
- In the event of weather conditions where shelter is desired, please move inside the I.D. Weeks Library for comfort and safety.
Note: Department Heads and their designees should keep a sharp lookout for how smoke is affected by prevailing wind patterns and be prepared to move evacuees upwind and/or notify building occupants downwind should smoke from a hazardous chemical fire travel towards a building.
Severe Weather Plan
- In the event of severe weather alerts such as tornado or severe thunderstorm, persons within Churchill-Haines Building should immediately proceed to the inner windowless rooms or central hallway of the building using the fastest route available.
- Designated staff from each area will quickly survey the floor to assure that evacuation is in progress or has been completed. The following staff have been designated:
- East West Corridor – Senior Secretary
- South and Central Service Corridor – Laboratory Storekeeper
Note: The attached plan can also be downloaded.